In closets where the ceiling slopes very close to the floor or the knee wall is very short low shelving can often be installed along the walls behind the hanging areas.
Framing an attic closet.
Framing nail a sheet of plywood to the existing floor joists so the short sides align with the joists and the long side is perpendicular to the joists.
Attic closet with rod suspended from the sloped ceiling closet.
Cut each sole plate and top plate to the desired length.
Most attic ladders are made to fit between joists set at 24 inches on center.
Depending on the span you ll need at least a 2 by 8 joist under foot for flooring.
Use a framing square to make sure this will be perfectly perpendicular to the front wall.
Do not add insulation between heated spaces.
Mark the top plate and the sole plate together for stud locations using a square and a pencil.
If you want your attic space to have a flat ceiling you ll need to add collar ties to the framing.
Cut 2 x 4s to the fit the length and width of the plywood and nail them flat on all four edges of the plywood as a base plate for the studs.
Often times with sloped ceilings you need to think outside the box when it comes to a storage closet.
It s just a matter of framing the knee wall the short part of the wall and the slanted ceiling.
Decide on the size of floor and remove insulation from between joists in that area.
We worked from 8am until 4 15 and got the bulk of the closet built.
Collar ties are horizontal members that like rafter ties extend from rafter to rafter but.
A slanted wall closet while not ideal is better than no closet at all.
Framing the opening can be easy if you can locate the ladder so that it is parallel with the existing ceiling joists.